Heating

Heating

Well the last Month has been very Hectic We have installed 4 Worcester Bosch Oil boilers , 3 Worcester Bosch Gas Boilers , 4 Gas fireplaces in between repairing  various heating systems and gas fires.

The areas covered were  Porthcawl, Maesteg, Port talbot, Neath, Swansea, Aberdare , Glynneath, Abercrave, Ystradgynlais, Ammanford and Brynamman

Worcester Boiler

Today our heating engineers were in Porthcawl  commissioning  our previously fitted Worcester Bosch system boiler coupled up to a underfloor heating system and an unvented hot water system

Fireplace

Today involved first fitting a Gazco Balanced flue LPG fire and a Elgin and Hall marble fireplace in Ammanford near Carmarthen , Then it was onto fit a Worcester Bosch Greenstar condensing combi at Crynant near Neath. To finalise the day I had to repair a Worcester Oil combination boiler in Seven Sisters, Neath

Servicing Day

Today was a day of getting your Boilers and gas fires  ready for winter

I carried out Services to Gas Fires, Oil Boilers and Gas Boilers  in the following areas , Neath, Port Talbot, Swansea, Glynneath, Resolven and Abercrave to finish off

 

Worcester Bosch Boiler

Yesterday we  Installed a Worcester Bosch 35 cdi System boiler in a New Build 5 Bedroom  House in Porthcawl,
Coupled to this was a Worcester Bosch Unvented hot water cylinder ,  an underfloor heating to downstairs with radiators to the other two floors.Each floor was controlled by a Drayton Wiser wireless programmable room thermostat linked to the customers router so they can be controlled via an app on his phone or tablet from anywhere in the world.

Today our Plumbers are Plumbing in some of the Bathroom suites and Showers

Oil Boiler Installation

Today we have just completed a Heating Conversion from Solid Fuel to Oil in Morriston, Swansea  . The customer had a 40 year old Trianco Coal Boiler which had seen its last days. We converted the Heating  System to Oil and installed a Worcester External A Rated Oil Boiler complete with a new Bunded Oil Tank . A lot of the Plumbing had to be altered to accommodate the new oil boiler. We installed new heating controls to give independent control over the heating and hot water. To make the new system as efficient as we could , a new insulated quick recovery hot water cylinder was fitted.

In addition to these works a new power shower was Plumbed in to make use off the extra hot water the customer now has.